
I have about 16 inches done. I need to get to 21/22 to switch to the top lacework. I'm roughly half-way through - which so are the Olympics, so not bad I'd say!

These little needles though are making my hands hurt so badly though. It was not wise to pick a project mostly knit on size 2 needles.

But it's so pretty - it's worth it. However, I should have picked a less demanding project I think!
Oh no...this is the perfect project. There has to be pain involved with the Olympics, you know....;)
ReplyDeleteAnd it looks like you are doing a beautiful job!
That is beautiful!!
ReplyDeleteGreat detail work. I like it!
ReplyDelete